Design
Engineering
Analysis
Pipe
Survey & Analysis
Cured
in Place Pipe
(CIPP)
Fold
& Form Pipe
(F&FP)
Pipe
Bursting
and
Slip Lining
Manhole
Restoration |
|
 |
|
|
THE
PROCESS
Whether
the pipe rehabilitation is large or small the basic process is the
same.
|
 |
The
Analysis
Live connections are located. The old pipe is then surveyed to determine
specific material and installation requirements. Closed circuit TV
video recordings are analyzed and the appropriate materials obtained.
|
 |
The
Installation
The sewage
flow is bypassed while the resin impregnated tube is inverted manhole
to manhole using water. The water inside the tube is then heated,
causing the thermo set resin to harden.
|
 |
The
Permanent Solution
After
the heated water sets the resin and transforms the flexible tube into
a rigid pipe. The water is cooled, the ends are cut and new tight
fitting pipe is put back in service while laterals are reinstated
with the remote cutting device. |
For
suggestions, comments, and concerns about this page,
e-mail us at: webmaster@afcotech.com
Date of last update: November
8, 2000
© 2000
AFCO Technologies, Inc.
|