Design
Engineering
Analysis
Pipe
Survey & Analysis
Cured
in Place Pipe
(CIPP)
Fold
& Form Pipe
(F&FP)
Pipe
Bursting
and
Slip Lining
Manhole
Restoration |
|
 |
|

THE
PROCESS |
 |
 |
STEP
1
CCTV inspect and clean target rehabilitation pipe to ensure no residues
inhibits sealing of pipe liner. Take precise measurements to locate
service connection points. |
STEP
2
Position liner over manhole and attach to winch cable that has been
strung through existing line. Pull liner through a series of rollers
that protect the liner from damage during insertion. |
 |
 |
STEP
3
Apply controlled pressure to liner which reforms the liner to form
to the existing pipe, creating a fit so tight that each joint or offset
is visible. |
STEP
4
Complete process by reopening the service connection with a remote-controlled
cutting device. |
For
suggestions, comments, and concerns about this page,
e-mail us at: webmaster@afcotech.com
Date of last update: November
29, 2000
© 2000
AFCO Technologies, Inc.
|