THE PROCESS
STEP 1
CCTV inspect and clean target rehabilitation pipe to ensure no residues inhibits sealing of pipe liner. Take precise measurements to locate service connection points.
STEP 2
Position liner over manhole and attach to winch cable that has been strung through existing line. Pull liner through a series of rollers that protect the liner from damage during insertion.
STEP 3
Apply controlled pressure to liner which reforms the liner to form to the existing pipe, creating a fit so tight that each joint or offset is visible.
STEP 4
Complete process by reopening the service connection with a remote-controlled cutting device.


Description
<< Technology << Equipment & Materials << THE PROCESS