Design
Engineering
Analysis
Pipe
Survey & Analysis
Cured
in Place Pipe
(CIPP)
Fold
& Form Pipe
(F&FP)
Pipe
Bursting
and
Slip Lining
Manhole
Restoration |
|
 |
|
 |
Closed
Circuit Television is employed to conduct the internal pipe inspections
before the Total Subterranean Infrastructure Rehabilitation
implementation begins. The survey is accomplished by a licensed applicator
to inspect the damaged section of pipe, identify all service connections
and openings and then document and analyze the effected area for corrective
planning. This crucial process is vital to the success of the restoration
process.
|
| Pipe
inspection and reconstruction may require remote controlled devices
or cutting devices depending on the terrain. Fixed debris, protruding
services and laterals reconnected after lining, are all applications
that may require remote access technology. All accomplished without
excavation. |

 |
For
suggestions, comments, and concerns about this page,
e-mail us at: webmaster@afcotech.com
Date of last update: November
28, 2000
© 2000
AFCO Technologies, Inc.
|